Nowshahr waste incineration plant located on the mining road has 200 tons of incoming waste per day, of which 100 tons is sub-municipal waste. Due to the high volume of waste generated along with the high costs of collection and transportation and more importantly the environmental problems and damage due to lack of standard management of this type of waste are among the main problems in this plan to provide technical and economic solutions to solve They are addressed.
Therefore, after conducting extensive research, the experts of this complex designed and built an environmentally friendly system to manage wet sub-municipal waste in Nowshahr city with a capacity of 100 tons per day. According to the tests and results of the implementation of this system, its capability and performance in managing this type of waste has been confirmed. This system has the ability to reduce the volume of wet sub-municipal waste up to 65-60% and the weight of this type of waste up to 35-30%. The product of this system can also be used as a fuel supplement with high calorific value (about 9000KJ / KG) in the power generation process of incineration plants. This system, in addition to reducing the volume of waste and turning it into a very valuable product, also purifies the produced leachates and turns them into water that can be used for agriculture and other similar uses. The basis of this plan is to provide a system with a capacity of 100 tons of incoming waste.